| 1. | Application of computer technology to shenzhen reservoir regulation 计算机技术在深圳水库调度中的应用 |
| 2. | Study on reservoir regulation at first filling at zipingpu water conservancy project 紫坪铺水利枢纽工程蓄水初期调度方案研究 |
| 3. | Optimization model for calculating basin water supply based on reservoir regulation and it ' s application 基于水库调蓄的流域可供水量优化模型研究与应用 |
| 4. | Countermeasures for sediment management in reservoirs regulation for flood control located in the middle yellow river 黄河中游水库群防洪调度中泥沙处理对策 |
| 5. | ( 2 ) for estimation of influences of hydraulic engineering ( control factors ) on floods , a reservoir regulation model is established based on calculation units controlled by each reservoir and reservoir system co - operations 建立了以每个水库控制面积为计算单元的水库(控制性因素)对洪水影响计算模型。 |
| 6. | When to realize the elementary goal of the reservoir regulation , the concept of " firm capacity " is used in the diagram , while to realize the higher goal , the " base capacity " is used 为实现水库调度的初级目标时,调度图中使用的是“保证出力”的概念;而为实现水库调度的高级目标时,调度图中使用的是“基础出力”的概念。 |
| 7. | The dynamic planning , with simple concept and theory and flexible method , aims at solving the planning for the multi - phase decision - making process and widely applies to the reservoir regulation and especially the joint - regulation of multi - reservoir 摘要动态规划是解决多阶段决策过程的规划,其概念和理论简单,方法灵活,在单库调度、特别是多库联合调度问题中有着广泛的应用。 |
| 8. | The main conclusions of the research are shown as follows : ( 1 ) with meeting the comprehensive using demands including flood control , ice prevention and water supply of the main stream , aimed at the maximum generation electricity in a period of the reservoir regulation , built up the optimal regulation model of the longyangxia - liujiaxia system and sanmenxia - xiaolangdi system and adopted poa method to solve it , obtained long series compensation regulation results 论文取得的主要成果如下: ( 1 )在满足全河干流防洪、防凌、供水等综合利用要求的前提下,以水库调度期发电量最大为目标,采用大系统分解协调方法,建立了龙刘和三小的优化模型,采用逐步优化算法( poa )求解了该模型。 |